Model Table PROJECT FORECAST ITEM PFI

Attributes

Attribute Description (where applicable)
Confirmed ByRepresents the responsible user for the confirmation
Cost Struct Item TypeCost Structure Item Type
Created By SnapshotCreated By Snapshot
Cut Off PeriodCut off period
Cut Off YearCut off year
Forecast Id KeyForecast Id, part of PK in original source
Forecast Item TypeForecast Item Type
Item No KeyItem No, part of PK in original source
Line DescriptionLine Description
Financially ResponsibleLine Financially Responsible
Financially Responsible CodeLine Financially Responsible Code
Line StatusLine Status
Fact Proj Forecast Item IDProject Forecast Item ID

Measures (table to be generated as far as possible)

Aggregation of measures is based on SUM if not explicitly noted.

This section describes the basic measures in the cube. These are either measures defined in the core Information Source, in the model itself or in the ETL process. The columns have the following meaning:

Measure Calculated Y/N Contains Time Intelligence Y/N Definition/Note (where applicable) Aggregation Type Hidden Y/N Tabular Expression
Actual Cost Budget Curr PFINNBudget Currency calculationNSUM([ACTUAL_BUDGET])
Actual Cost PFINNNSUM([ACTUAL])
Actual Cost Proj Curr PFINNProject Currency calculationNSUM([ACTUAL_PROJECT])
Actual Cost RC PFIYYReporting Currency calculationNSUM([REP_CURR_ACTUAL])/[Currency Rate]
Actual Cost Trans Curr PFINNNSUM([ACTUAL_TRANSACTION])
Actual Rev Budget Curr PFINNBudget Currency calculationNSUM([ACTUAL_BUDGET_REV])
Actual Rev PFINNNSUM([ACTUAL_REV])
Actual Rev Proj Curr PFINNProject Currency calculationNSUM([ACTUAL_PROJECT_REV])
Actual Rev RC PFIYYReporting Currency calculationNSUM([REP_CURR_ACTUAL_REV])/[Currency Rate]
Actual Rev Trans Curr PFINNNSUM([ACTUAL_TRANS_REV])
Adjusted ETC Cost Budget Curr PFINNBudget Currency calculationNSUM([ADJUSTED_ETC_BUDGET])
Adjusted ETC Cost PFINNNSUM([ADJUSTED_ETC])
Adjusted ETC Cost Proj Curr PFINNProject Currency calculationNSUM([ADJUSTED_ETC_PROJECT])
Adjusted ETC Cost RC PFIYYReporting Currency calculationNSUM([REP_CURR_ADJUSTED_ETC])/[Currency Rate]
Adjusted ETC Cost Trans Curr PFINNNSUM([ADJUSTED_ETC_TRANSACTION])
Adjusted ETC Rev Budget Curr PFINNBudget Currency calculationNSUM([ADJUSTED_ETC_BUDGET_REV])
Adjusted ETC Rev PFINNNSUM([ADJUSTED_ETC_REV])
Adjusted ETC Rev Proj Curr PFINNProject Currency calculationNSUM([ADJUSTED_ETC_PROJECT_REV])
Adjusted ETC Rev RC PFIYYReporting Currency calculationNSUM([REP_CURR_ADJUSTED_ETC_REV])/[Currency Rate]
Adjusted ETC Rev Trans Curr PFINNNSUM([ADJUSTED_ETC_TRANSACTION_REV])
Budget Cost Budget Curr PFINNBudget Currency calculationNSUM([BUDGET_BUDGET])
Budget Cost PFINNBudget Currency calculationNSUM([BUDGET])
Budget Cost Proj Curr PFINNProject Currency calculationNSUM([BUDGET_PROJECT])
Budget Cost RC PFIYYReporting Currency calculationNSUM([REP_CURR_BUDGET])/[Currency Rate]
Budget Cost Trans Curr PFINNBudget Currency calculationNSUM([BUDGET_TRANSACTION])
Budget Rev Budget Curr PFINNBudget Currency calculationNSUM([BUDGET_BUDGET_REV])
Budget Rev PFINNBudget Currency calculationNSUM([BUDGET_REV])
Budget Rev Proj Curr PFINNProject Currency calculationNSUM([BUDGET_PROJECT_REV])
Budget Rev RC PFIYYReporting Currency calculationNSUM([REP_CURR_BUDGET_REV])/[Currency Rate]
Budget Rev Trans Curr PFINNBudget Currency calculationNSUM([BUDGET_TRANS_REV])
Committed Cost Budget Curr PFINNBudget Currency calculationNSUM([COMMITTED_BUDGET])
Committed Cost PFINNNSUM([COMMITTED])
Committed Cost Proj Curr PFINNProject Currency calculationNSUM([COMMITTED_PROJECT])
Committed Cost Trans Curr PFINNNSUM([COMMITTED_TRANSACTION])
Connected ETC CCO Cost Budget Curr PFINNBudget Currency calculationNSUM([CONNECTED_ETC_CCO_BUDGET])
Connected ETC CCO Cost PFINNNSUM([CONNECTED_ETC_CCO])
Connected ETC CCO Cost Proj Curr PFINNProject Currency calculationNSUM([CONNECTED_ETC_CCO_PROJECT])
Connected ETC CCO Cost RC PFIYYReporting Currency calculationNSUM([REP_CURR_CONNECTED_ETC_CCO])/[Currency Rate]
Connected ETC CCO Cost Trans Curr PFINNNSUM([CONNECTED_ETC_CCO_TRANSACTION])
Connected ETC CCO Rev Budget Curr PFINNBudget Currency calculationNSUM([CONN_ETC_CCO_BUDGET_REV])
Connected ETC CCO Rev PFINNNSUM([CONN_ETC_CCO_REV])
Connected ETC CCO Rev Proj Curr PFINNProject Currency calculationNSUM([CONN_ETC_CCO_PROJECT_REV])
Connected ETC CCO Rev RC PFIYYReporting Currency calculationNSUM([REP_CURR_CONN_ETC_CCO_REV])/[Currency Rate]
Connected ETC CCO Rev Trans Curr PFINNNSUM([CONN_ETC_CCO_TRANSACTION_REV])
Connected ETC Cost Budget Curr PFINNBudget Currency calculationNSUM([CONNECTED_ETC_BUDGET])
Connected ETC Cost PFINNNSUM([CONNECTED_ETC])
Connected ETC Cost Proj Curr PFINNProject Currency calculationNSUM([CONNECTED_ETC_PROJECT])
Connected ETC Cost RC PFIYYReporting Currency calculationNSUM([REP_CURR_CONNECTED_ETC])/[Currency Rate]
Connected ETC Cost Trans Curr PFINNNSUM([CONNECTED_ETC_TRANSACTION])
Connected ETC Rev Budget Curr PFINNBudget Currency calculationNSUM([CONN_ETC_BUDGET_REV])
Connected ETC Rev PFINNNSUM([CONN_ETC_REV])
Connected ETC Rev Proj Curr PFINNProject Currency calculationNSUM([CONN_ETC_PROJECT_REV])
Connected ETC Rev RC PFIYYReporting Currency calculationNSUM([REP_CURR_CONN_ETC_REV])/[Currency Rate]
Connected ETC Rev Trans Curr PFINNNSUM([CONN_ETC_TRANSACTION_REV])
EAC Cost Budget Curr PFINNBudget Currency calculationNSUM([EAC_BUDGET])
EAC Cost PFINNNSUM([EAC])
EAC Cost Proj Curr PFINNProject Currency calculationNSUM([EAC_PROJECT])
EAC Cost RC PFINYReporting Currency calculationNSUM([REP_CURR_EAC])/[Currency Rate]
EAC Cost Trans Curr PFINNNSUM([EAC_TRANSACTION])
EAC Net Change Cost Budget Curr PFINNBudget Currency calculationNSUM([EAC_NET_CHANGE_BUDGET])
EAC Net Change Cost PFINNNSUM([EAC_NET_CHANGE])
EAC Net Change Cost Proj Curr PFINNProject Currency calculationNSUM([EAC_NET_CHANGE_PROJECT])
EAC Net Change Cost RC PFIYYReporting Currency calculationNSUM([REP_CURR_EAC_NET_CHANGE])/[Currency Rate]
EAC Net Change Cost Trans Curr PFINNNSUM([EAC_NET_CHANGE_TRANSACTION])
EAC Net Change Rev Budget Curr PFINNBudget Currency calculationNSUM([EAC_NET_CHANGE_BUDGET_REV])
EAC Net Change Rev PFINNNSUM([EAC_NET_CHANGE_REV])
EAC Net Change Rev Proj Curr PFINNProject Currency calculationNSUM([EAC_NET_CHANGE_PROJECT_REV])
EAC Net Change Rev RC PFIYYReporting Currency calculationNSUM([REP_CURR_EAC_NET_CHANGE_REV])/[Currency Rate]
EAC Net Change Rev Trans Curr PFINNNSUM([EAC_NET_CHANGE_TRANS_REV])
EAC Rev Budget Curr PFINNBudget Currency calculationNSUM([EAC_BUDGET_REV])
EAC Rev PFINNNSUM([EAC_REV])
EAC Rev Proj Curr PFINNProject Currency calculationNSUM([EAC_PROJECT_REV])
EAC Rev RC PFIYYReporting Currency calculationNSUM([REP_CURR_EAC_REV])/[Currency Rate]
EAC Rev Trans Curr PFINNNSUM([EAC_TRANS_REV])
Earned Value Cost Budget Curr PFINNBudget Currency calculationNSUM([EARNED_VALUE_BUDGET])
Earned Value Cost PFINNNSUM([EARNED_VALUE])
Earned Value Cost Proj Curr PFINNProject Currency calculationNSUM([EARNED_VALUE_PROJECT])
Earned Value Cost RC PFINYReporting Currency calculationNSUM([REP_CURR_EARNED_VALUE])/[Currency Rate]
Earned Value Cost Trans Curr PFINNNSUM([EARNED_VALUE_TRANSACTION])
Earned Value Rev Budget Curr PFINNBudget Currency calculationNSUM([EARNED_VALUE_BUDGET_REV])
Earned Value Rev PFINNNSUM([EARNED_VALUE_REV])
Earned Value Rev Proj Curr PFINNProject Currency calculationNSUM([EARNED_VALUE_PROJECT_REV])
Earned Value Rev RC PFIYYReporting Currency calculationNSUM([REP_CURR_EARNED_VALUE_REV])/[Currency Rate]
Earned Value Rev Trans Curr PFINNNSUM([EARNED_VALUE_TRANS_REV])
Estimated Cost Budget Curr PFINNBudget Currency calculationNSUM([ESTIMATED_BUDGET])
Estimated Cost PFINNNSUM([ESTIMATED])
Estimated Cost Proj Curr PFINNProject Currency calculationNSUM([ESTIMATED_PROJECT])
Estimated Cost RC PFIYYReporting Currency calculationNSUM([REP_CURR_ESTIMATED])/[Currency Rate]
Estimated Cost Trans Curr PFINNNSUM([ESTIMATED_TRANSACTION])
Estimated Rev Budget Curr PFINNBudget Currency calculationNSUM([ESTIMATED_BUDGET_REV])
Estimated Rev PFINNNSUM([ESTIMATED_REV])
Estimated Rev Proj Curr PFINNProject Currency calculationNSUM([ESTIMATED_PROJECT_REV])
Estimated Rev RC PFIYYReporting Currency calculationNSUM([REP_CURR_ESTIMATED_REV])/[Currency Rate]
Estimated Rev Trans Curr PFINNNSUM([ESTIMATED_TRANS_REV])
ETC Cost Budget Curr PFINNBudget Currency calculationNSUM([ETC_BUDGET])
ETC Cost PFINNNSUM([ETC])
ETC Cost Proj Curr PFINNProject Currency calculationNSUM([ETC_PROJECT])
ETC Cost RC PFIYYReporting Currency calculationNSUM([REP_CURR_ETC])/[Currency Rate]
ETC Cost Trans Curr PFINNNSUM([ETC_TRANSACTION])
ETC Rev Budget Curr PFINNBudget Currency calculationNSUM([ETC_BUDGET_REV])
ETC Rev PFINNNSUM([ETC_REV])
ETC Rev Proj Curr PFINNProject Currency calculationNSUM([ETC_PROJECT_REV])
ETC Rev RC PFIYYReporting Currency calculationNSUM([REP_CURR_ETC_REV])/[Currency Rate]
ETC Rev Trans Curr PFINNNSUM([ETC_TRANS_REV])
Planned Committed Cost Budget Curr PFINNBudget Currency calculationNSUM([PLANNED_COMMITTED_BUDGET])
Planned Committed Cost PFINNNSUM([PLANNED_COMMITTED])
Planned Committed Cost Proj Curr PFINNProject Currency calculationNSUM([PLANNED_COMMITTED_PROJECT])
Planned Committed Cost RC PFIYYReporting Currency calculationNSUM([REP_CURR_PLANNED_COMMITTED])/[Currency Rate]
Planned Committed Cost Trans Curr PFINNNSUM([PLANNED_COMMITTED_TRANSACTION])
Planned Cost Budget Curr PFINNBudget Currency calculationNSUM([PLANNED_BUDGET])
Planned Cost PFINNNSUM([PLANNED])
Planned Cost Proj Curr PFINNProject Currency calculationNSUM([PLANNED_PROJECT])
Planned Cost RC PFIYYReporting Currency calculationNSUM([REP_CURR_PLANNED])/[Currency Rate]
Planned Cost Trans Curr PFINNNSUM([PLANNED_TRANSACTION])
Planned Rev Budget Curr PFINNBudget Currency calculationNSUM([PLANNED_BUDGET_REV])
Planned Rev PFINNNSUM([PLANNED_REV])
Planned Rev RC PFIYYReporting Currency calculationNSUM([REP_CURR_PLANNED_REV])/[Currency Rate]
Planned Rev Trans Curr PFINNNSUM([PLANNED_TRANS_REV])
Planned Revenue Proj Curr PFINNProject Currency calculationNSUM([PLANNED_PROJECT_REV])
Posted Rev Budget Curr PFINNBudget Currency calculationNSUM([POSTED_BUDGET_REV])
Posted Rev PFINNNSUM([POSTED_REV])
Posted Rev Proj Curr PFINNProject Currency calculationNSUM([POSTED_PROJECT_REV])
Posted Rev RC PFIYYReporting Currency calculationNSUM([REP_CURR_POSTED_REV])/[Currency Rate]
Posted Rev Trans Curr PFINNNSUM([POSTED_TRANS_REV])
Preliminary Rev Budget Curr PFINNBudget Currency calculationNSUM([PRELIMINARY_BUDGET_REV])
Preliminary Rev PFINNNSUM([PRELIMINARY_REV])
Preliminary Rev Proj Curr PFINNProject Currency calculationNSUM([PRELIMINARY_PROJECT_REV])
Preliminary Rev RC PFIYYReporting Currency calculationNSUM([REP_CURR_PRELIMINARY_REV])/[Currency Rate]
Preliminary Rev Trans Curr PFINNNSUM([PRELIMINARY_TRANS_REV])
Previous EAC Cost Budget Curr PFINNBudget Currency calculationNSUM([PREVIOUS_EAC_BUDGET])
Previous EAC Cost PFINNNSUM([PREVIOUS_EAC])
Previous EAC Cost Proj Curr PFINNProject Currency calculationNSUM([PREVIOUS_EAC_PROJECT])
Previous EAC Cost RC PFINYReporting Currency calculationNSUM([REP_CURR_PREVIOUS_EAC])/[Currency Rate]
Previous EAC Cost Trans Curr PFINNNSUM([PREVIOUS_EAC_TRANSACTION])
Previous EAC Rev Budget Curr PFINNBudget Currency calculationNSUM([PREVIOUS_EAC_BUDGET_REV])
Previous EAC Rev PFINNNSUM([PREVIOUS_EAC_REV])
Previous EAC Rev Proj Curr PFINNProject Currency calculationNSUM([PREVIOUS_EAC_PROJECT_REV])
Previous EAC Rev RC PFIYYReporting Currency calculationNSUM([REP_CURR_PREVIOUS_EAC_REV])/[Currency Rate]
Previous EAC Rev Trans Curr PFINNNSUM([PREVIOUS_EAC_TRANS_REV])
Previous ETC Cost Budget Curr PFINNBudget Currency calculationNSUM([PREVIOUS_ETC_BUDGET])
Previous ETC Cost PFINNNSUM([PREVIOUS_ETC])
Previous ETC Cost Proj Curr PFINNProject Currency calculationNSUM([PREVIOUS_ETC_PROJECT])
Previous ETC Cost RC PFIYYReporting Currency calculationNSUM([REP_CURR_PREVIOUS_ETC])/[Currency Rate]
Previous ETC Cost Trans Curr PFINNNSUM([PREVIOUS_ETC_TRANSACTION])
Previous ETC Rev Budget Curr PFINNBudget Currency calculationNSUM([PREVIOUS_ETC_BUDGET_REV])
Previous ETC Rev PFINNNSUM([PREVIOUS_ETC_REV])
Previous ETC Rev Proj Curr PFINNProject Currency calculationNSUM([PREVIOUS_ETC_PROJECT_REV])
Previous ETC Rev RC PFIYYReporting Currency calculationNSUM([REP_CURR_PREVIOUS_ETC_REV])/[Currency Rate]
Previous ETC Rev Trans Curr PFINNNSUM([PREVIOUS_ETC_TRANS_REV])
Unspread Cost Budget Curr PFINNBudget Currency calculationNSUM([UNSPREAD_AMOUNT_BUDGET])
Unspread Cost PFINNNSUM([UNSPREAD_AMOUNT])
Unspread Cost Proj Curr PFINNProject Currency calculationNSUM([UNSPREAD_AMOUNT_PROJECT])
Unspread Cost RC PFIYYReporting Currency calculationNSUM([REP_CURR_UNSPREAD_AMOUNT])/[Currency Rate]
Unspread Cost Trans Curr PFINNNSUM([UNSPREAD_AMOUNT_TRANSACTION])
Unspread Rev Budget Curr PFINNBudget Currency calculationNSUM([UNSPREAD_AMOUNT_BUDGET_REV])
Unspread Rev PFINNNSUM([UNSPREAD_AMOUNT_REV])
Unspread Rev Proj Curr PFINNProject Currency calculationNSUM([UNSPREAD_AMOUNT_PROJECT_REV])
Unspread Rev RC PFIYYReporting Currency calculationNSUM([REP_CURR_UNSPREAD_AMOUNT_REV])/[Currency Rate]
Unspread Rev Trans Curr PFINNNSUM([UNSPREAD_AMOUNT_TRANS_REV])
Used Cost Budget Curr PFINNBudget Currency calculationNSUM([USED_BUDGET])
Used Cost PFINNNSUM([USED])
Used Cost Proj Curr PFINNProject Currency calculationNSUM([USED_PROJECT])
Used Cost RC PFIYYReporting Currency calculationNSUM([REP_CURR_USED])/[Currency Rate]
Used Cost Trans Curr PFINNNSUM([USED_TRANSACTION])

Time Intelligence Measures

Time based measures are calculated in the cube with respect to other measures. The table below defines the meaning/definition of  the different time measures. These measures need to be used with a specific time dimension hierarchy [REPORTING_DATE].[RepDateMFHy].

Measure Meaning
Ytd Aggregated value for current month in current  year. E.g. for period 201210 Ytd represents sum of periods 201200-201210.
R12 For a given period, the sum all months from one year back up to the previous month. E.g. Rolling 12 for 201210 is the sum of months 201110 - 201209
PY Previous Year
The value of the corresponding month one year back. E.g. for month 201210, the value of month 201110.
YTD PY Year to Date Previous Year
Aggregated value for corresponding month one year back. E.g. for month 201210 YTD Previous Year represents sum of months 201101-201110.
R12 PY Rolling 12 (completed) Months Previous Year
For a given month, first going one year back, then taking the sum of all months from one (more) year back up to the previous month. E.g. for month 201210 the sum of month 201010-201109
Avg XXX Ytd Sum XXX YTD/Count XXX YTD
Avg XXX R12 Sum XXX R12/Count XXX R12
XXX % YTD Count XXX YTD/Count YYY YTD
XXX % R12 Count XXX R12/Count XXX R12

USED BY MODEL(S)

Model Name Product Area

Data source Information

The data source for this object is defined using IFS Developer Tool. The data source contains a number of transformations where the model reads data from the last step, i.e. the Data source view name (DW Source View Name).

Link to information source documentation: . http://blablabla to be generated...

Model Table DW Source view (SQL Server) BI Access View Referenced Information Source Recommended Access Type
PROJECT FORECAST ITEM PFIFACT_PROJ_FORECAST_ITEM_TMFACT_PROJ_FORECAST_ITEM_BIFACT_PROJ_FORECAST_ITEMOn Line

SPECIAL INFO